A. Consultancy Projects (Selected):
Member, Trainer for "Training Program
for Professionals on the Familiarization of Bangladesh Standards (BDS) for
PV Systems" as requested by Sustainable And Renewable Energy Development
Authority (SREDA), Ministry of Power, Energy and Mineral Resources, Dhaka:
June 2018
Member, BUET
Consultant Team for the "Determination of Input-Output Coefficient of
Cell Phone Assembly Factory ALAMIN & BROTHERS, Gazipur, Bangladesh" as
requested by
Customs, Excise and VAT
Commissionerate, Dhaka (North):
July 2018
Member, BUET
Consultant Team for the "Determination of Input-Output Coefficient of
Cell Phone Assembly Factory Carlcare Technology, Gazipur, Bangladesh" as
requested by
Customs, Excise and VAT Commissionerate, Dhaka (North):
July 2018
Member, BUET Team for the Preparation of "Inspection
Report on the Installed Television Base Station and Broadcast Transmission
Equipment of Barind Media Ltd. (Duronto TV), Banani, Dhaka"
as requested by Barind Media Limited: Oct 2017
Member, BUET
Consultant Team for the project of "Computerized
Control System for Modernization of Gate and Hoisting System of Teesta
Barrage"
as requested by Bangladesh
Water Development Board (BWDB):
June 2017 to June 2018
Member, BUET Consultant Team for the "Expert
Support for Capacity Build up in Transmission Planning and System Operation
for Bangladesh Power Sector" as requested by Ricardo Energy &
Environment, UK: May 2017 to June 2018
Member, BUET
Consultant Team for the "Design and Specification Vetting for
Installation and Commissioning of a 5MW
Sludge Power Generation
System (SPGS)” to be implemented by a Chinese contractor at Tannery
Industrial Estate (TIED), Savar, Dhaka under Bangladesh Small and Cottage
Industries Corporation (BSCIC), Dhaka, Bangladesh: Dec 2016 to date
Member, BUET
Consultant Team for the "Design and Specification Vetting of Installation
and Commissioning of Turnkey Construction and Implementation of Common Tannery Effluent Treatment Plant including
Collection and Conveyance System, Common Chrome Recovery Unit, Solid Waste
Dumping Yard and Central Laboratory" being implemented by a Chinese
contractor at Tannery Industrial Estate (TIED), Savar, Dhaka under
Bangladesh Small and Cottage Industries Corporation (BSCIC), Dhaka,
Bangladesh: Apr 2014 to 2018
Member,
BUET
Consultant
Team for the "Technical Specification Preparation, Tender Evaluation, and
Supervision of Installation & Commissioning of Two Diesel Generators of 800
kVA and 1250 kVA" as requested by Bangladesh Agricultural Research
Institute (BARI), Gazipur, Bangladesh: Dec 2014 to date
Member, BUET
Consultant Team for the
"Investigation and Report
Preparation on Determining the Functioning Capabilities of Various Optical
Fiber Network Equipment (including MUX, Switches and Optical Platform)"
imported by Summit Communications Ltd. as requested by Commissioner, Custom
House, Dhaka: Aug 2016
Member, BUET
Consultant Team for the project "Assignment
for Technology Adaptation and National Capacity Building for Climate
Technology Centre and Network (CTCN) in Bangladesh", conducted by the
Center for Energy Studies, BUET and funded by the Institute for Global
Environmental Studies (IGES), Japan: Aug 2014 - Jan 2015
Member, BUET
Consultant Team for the "Electrical
Load Forecasting, Cost Estimation and Technical Specification Preparation
for the G-to-G (Bangladesh-China) Mega Project of The Expansion and
Strengthening of Power System Network Under Dhaka Power Distribution Company
(DPDC) Area for Year 2025” as requested by DPDC, Dhaka, Bangladesh: July
2015
Member,
BUET
Consultant
Team for the "Investigation and Report Preparation of the Cause and
Remedy of Overheat Problem of a 1000 kVA AVR" installed in Novartis,
Gazipur, Bangladesh: July 2014
Member,
BUET
Consultant Team for the "Test
Facilities Development and Testing of 750 kVA and
1000 kVA, 11/0.415 kV Dry
Type Cast Resin Transformers"
manufactured by Energypac Engineering Ltd., Savar, Bangladesh: June 2014
Member, BUET
Consultant Team for the "Development
of Schemes for Preventing Blackout in Bangladesh Power Systems" as
Requested by the Power Grid Company Bangladesh (PGCB) Ltd., Dhaka,
Bangladesh:
Jan 2009-Dec 2009
Member, BUET
Consultant Team for the
project of "Testing and Commissioning of 360 kW Gas Generator at
BeaniBazar, Sylhet Gas Field Limited (SGFL)", Sylhet, Bangladesh:
July
2009
Member, BUET Consultant Team for the "Vetting of the Specifications of the Tender Documents for Supply, Installation, Testing and Commissioning of Closed Circuit Television (CCTV) System" for Head Office, Bangladesh Bank Building, Dhaka, Bangladesh: Jan 2009
Member,
BUET
Consultant
Team for the "Investigation of the Cause, Nature and Circumstances of
Fire in Penguin Ice & Fish Processing (Pvt.) Ltd.", Ismailpur,
Shyamnagar, Satkhira, Bangladesh: Jan 2009
Member, BUET
Consultant Team for the "Testing,
Checking and Evaluation of Electrical Installations"
at South Asia Enterprise Development Facility (SEDF) Office, Dhaka,
Bangladesh: May 2006
"Preparing Written Exam Questions and Script Evaluation for the Recruitment of Electrical and Telecommunications Engineers" for many national (Government) organizations, e.g., Power Grid Company Bangladesh (PGCB); Dhaka Power Distribution Company (DPDC) Ltd.; Bangladesh Power Development Board (BPDB); Electricity Generation Company of Bangladesh (EGCB) Ltd.; Bangladesh Public Service Commission (BPSC) of Bangladesh Government; Bangladesh Infrastructure Finance Fund Ltd. (BIFFL) under Ministry of Finance of Bangladesh Government; Bangladesh Gas Fields Company Ltd. (BGFCL) and Paschimanchal Gas Comp Ltd. under Bangladesh Oil, Gas and Mineral Corporation (Petrobangla); Eastern Refinery Ltd. and Meghna Petroleum Ltd. under Bangladesh Petroleum Corporation and Water and Sweage Authority (WASA): 2005 to date
B. Testing and Report
Preparation Projects (Selected):
"Testing
and Certification of CAT-6 UTP Data Cable"
as Requested by
BGMEA University of Fashion & Technology (BUFT),
Dhaka, Bangladesh: Jan 2018
"Testing
and Certification of Transformer of a 800 kVA Transformer"
as requested by
Norp Knit
Industries Ltd. Unit-2, Gazipur, Bangladesh: Aug 2017
"Testing
and Report Preparation on Two Air Circuit Breakers (ACBs), Two Capacitor
Banks and One Diesel Generator" Supplied
by JLEPCL-DCL-JV, Uttara, Dhaka, Bangladesh: Oct 2016
"Testing
and Report Preparation on A 1540 AH Deep Cycle Lead Acid Battery of Gaston
Brand"
as requested by UNHCR Sub-Office, Cox's Bazar, Bangladesh: Aug 2016
"Testing
and Report Preparation on a 33/11.55 kV, 10/14 MVA, 3-Phase Transformer and
a 33/11.0 kV, 16/20 MVA, 3-Phase
Transformer"
Manufactured by Energypac Engineering Ltd., Savar, Dhaka, Bangladesh: June
2015
"Testing
and Report Preparation on A CISCO 3845 Router with Related Accessories"
as requested by Commissioner, Custom House, Dhaka: Nov 2014
"Testing
and Report Preparation on A 50W Repeater Station for Wireless Communications
System"
as requested by Dhaka South City Corporation: Sep 2014
"Testing
and Report Preparation for the Calibration Test of Various Electrical
Digital Meters (Earth Tester, Clamp Meter and Voltmeter)"
as requested by StyleCraft Ltd., Gazipur, Bangladesh: Apr 2014
"Standard
Type Test and Certification
of 3-Phase, 100 kVA/200kVA/250 kVA, 11 kV/415 V
Distribution Transformers"
manufactured by different manufacturers in Bangladesh, e.g.,
Energypac Engineering Ltd.,
General Electric Manufacturing Co. Ltd.,
Integral Electric Company, Powermann Bangladesh
Limited, Techno Venture Ltd.,
Multiple Energy Ltd.,
Bengal Telecommunication & Electric Corporation (BETELCO) Ltd., ACME
Electronics Ltd., Adex Corporation Ltd.,
Multiple Energy Ltd.
and General Electric Manufacturing Co. Ltd.: 2005
to date
"Testing
and Report Preparation of Low Voltage and High Voltage Electrical Cables"
manufactured in Bangladesh and Overseas, e.g.,
1×400 rm NYY (XLPE) and 1×500
rm NYY (XLPE) of Poly brand; 4´240
sm NYFGbY Cable of Supersign brand; 1×1.3 rm BYA, 1×2 rm BYA, 1×10 rm BYA,
1×95 rm NYY, 1×300 rm NYY and 3×1.0 rm cables of Partex Brand; MEP Brand 3×50 sm/25 rm NYY
cable;
BYA 1×10
rm, BYA 1×25 rm, BYM 1×1.5 rm, BYM 1×2.5 rm, BYM 1×4 rm, BYM 1×6 rm, NYY
4×16 rm cables of Poly
brand;
3×25 rm and 3×35 rm NYYF cable of BRB brand
and HR PVC Winding Wire of Unistar brand (India): 2005 to date
"Evaluation
of Quality and Quantity of Equipment of 250 KVA, 11/0.415 KV Sub-Station and
Generating Units"
Commissioned at the Campus of Ahsanullah University of Science and
Technology, Dhaka, Bangladesh: June 2008
"Testing
and Report Preparation on Lead-Acid Batteries of Various Capacities"
supplied by various battery manufacturing companies, e.g.,
Electro Battery
Limited,
VOLVO, Gaston Brand, Rahim Afrooz Batteries Limited, Hamko Corporation Ltd.
and Eco Batteries Ltd.: 2005 to date
"Testing and Report Preparation on Singer
Brand 1300 mm Sweep AC Ceiling Fan" as
requested by Singer Bangladesh Limited, Dhaka, Bangladesh: Dec 2005